Important Notice: Our web hosting provider recently started charging us for additional visits, which was unexpected. In response, we're seeking donations. Depending on the situation, we may explore different monetization options for our Community and Expert Contributors. It's crucial to provide more returns for their expertise and offer more Expert Validated Answers or AI Validated Answers. Learn more about our hosting issue here.

What types of notifications are required by the rule?

notifications rule types
0
Posted

What types of notifications are required by the rule?

0

The notifications required by the rule are: • Substantial change to program implementation or significant change to schedule for carrying out elements. (Within 30 days of adoption). The notification should include a description of the changes and the basis on which they were made • Inability to meet remediation deadlines in the rule and unable to reduce pressure (When operator determines schedules cannot be met). A description of defects/repairs needed, reason for delay, why pressure can t be reduced, basis for concluding delay won t jeopardize health or environment, schedule for repair, other mitigative actions planned should be included. • Use of technology other than in-line inspection, Direct Assessment, or pressure testing for conducting assessments. (180 days prior to assessment). The operator should provide a description of the “other technology”, its basis for concluding that the method will result in equivalent understanding of pipe condition, and its schedule for assessment.

Related Questions

What is your question?

*Sadly, we had to bring back ads too. Hopefully more targeted.

Experts123