What size project is best suited for an Asuret assessment?
The assessment is designed for projects that represent at least a million dollars in total investment–typically, about $200,000 in license fees and another $800,000 or so in implementation costs (customization, integration, testing, training, etc.). If the project risk level is unusually high, however, it may make sense to conduct an assessment even when the total cost is well under this figure.