What should I do with equipment in stock not installed before 1st July 2003 and not compliant with the ATEX 94/9/EC Directive?
You cannot use these products for installations set up after 1st July 2003. For installations in service before 1st July 2003, a documented assessment of the risks of explosion must demonstrate that these risks have been taken into account. In particular: • For dust-filled atmospheres: the existing working premises must be adapted to comply before 1st July 2006.