WHAT REQUIRES STAMP, AND WET STAMP/ SIGNATURE?
• At initial and all subsequent plan check submittals: Stamp or seal: may be original or copy (with expiration date of the license): all sheets of plans, and cover sheet or first page of the calculations, specifications and reports, • At final submittal for permit: Wet stamp and wet signature on cover sheet of plans and cover sheet or first page of calculations, specifications and reports. • All other sheets of the final plan set to be stamped, original or copy, but not necessarily signed. AIDING AND ABETTING What constitutes aiding and abetting? (See: B & P Code Sections 5582, 5582.1, and Title 16, Section 135 and 151 of the CCR for architects, and similarly for engineers under B & P Code Section 6735): Aiding and abetting occurs when a California licensed architect: • Assists unlicensed individuals to circumvent the Architects Pracetice Act. (B & P Code Section 5500 et seq.) • Stamps and signs documents which have not been prepared by the architect or in the architect’s office or und
Related Questions
- I’ve heard that Signature Homes, LLC, uses some of the latest in building material technology. What are some of these?
- I’ve heard that Signature Homes, LLC, uses some of the latest in building material technology. What are some of these?
- My historic religious building requires expensive repairs. How can CRS help?
- Is Turain Signature Homes a good house building business?
- Is Turain Signature Homes a good house building business?
- WHAT REQUIRES STAMP, AND WET STAMP/ SIGNATURE?