What permits are needed in order to build a house?
For homes or businesses built where the sewer system is not available, the following permits will need to be issued by Environmental Health: 1. Improvement Permit: This is a permit that is issued for sites that have acceptable soil to support a septic system. Some lots that have been recently subdivided already have an issued improvement permit. Check with our office to get a copy of the improvement permit. 2. Construction Authorization: This is the permit that allows for the installation of the septic system and must be issued before the building permit is issued. To get a construction authorization, you must submit an application with a floor plan of the building and a site plan of the property. 3. Well Permit: If the property is not served by public water, you will also need to apply for a well permit Application for permits are available on our Web site.