What parameters should be measured when using RegenOx?
In order to document the effectiveness of a RegenOx treatment, Regenesis recommends the following performance monitoring program. Prior to injection of the chemical oxidant, a baseline round of sampling should be performed to identify the groundwater quality/conditions and soil concentrations at the site. The following table outlines the parameters and methods that should be used to monitor the performance of the RegenOx project as well as the recommended monitoring schedule (shown below). Analyte Method Baseline ~2 wks after ea. inj. 4 wks after final inj.