What other permits are needed for the Stratospheric Ozone Protection Annual Operating Permit Application (APCF) before I can start work?
The following is a list of other agencies that may have jurisdiction over these projects. Please be advised that their involvement will depend upon the location, nature, type and size of the project: • Local Municipality (structural, zoning, building) • Miami-Dade County Building department (if located in unincorporated Miami-Dade County) • Florida Department of Environmental Protection (FDEP) • US Environmental Protection Agency (training, certification, equipment specifications and procedures) Questions regarding specific situations not outlined above should be referred to the Permitting Section staff at telephone 305-372-6600. This question is intended to give you an idea of what other permits may be needed. Depending on your situation, you may need one or more of the above-mentioned permits. Additionally, there may be instances when a permit that is not listed here is required. We encourage you to call the contact number at the bottom of this page to discuss your particular case or