What needs to be included in pool or spa plans?
Above ground, self contained spas require a site plan approved by Planning and Zoning. No structural details are necessary. New pools and spas require a site plan indicating location of pool/spa, existing fencing, gates and doors leading to pool area. Engineered structural details must be wet stamped.