What must I do to comply with the AZPDES Construction General Permit following coverage?
• Maintain a copy of the SWPPP on site • Post Authorization Number near site entrance • Implement and maintain Best Management Practices (BMP’s) throughout the project • Incorporate a combination of BMP’s to address erosion and sediment control and the control of wastes and other construction site pollutants • Conduct site inspections per the frequency detailed in the SWPPP • Promptly correct deficiencies found during inspections or field observations as soon as possible • Repair and maintain BMP’s when found to be ineffective or in need of repair • Update the SWPPP to reflect changes or modifications relative to current site conditions • Submit a Notice of Termination (NOT) to ADEQ upon final site stabilization Resources for the Construction Industry City of Chandler Storm Drainage System Design – Technical Design Manual No.
Related Questions
- If a Construction Activity Does Not Adversely Impact Water Quality, is Coverage Under the Construction General Permit Still Necessary?
- Do I need to have coverage under the Multi-Sector General Permit (MSGP) and the Construction Geneeral Permit (CGP) for mining activity?
- What is Construction Stormwater Permit Coverage?