WHAT METHODS ARE USED IN SLURRY WALL CONSTRUCTION?
Slurry wall construction starts with the slurry excavation technique, which was developed in Europe and has been used in the United States since the 1940s. The slurry wall construction technique involves excavating a narrow trench that is kept full of an engineered fluid or slurry. The slurry exerts hydraulic pressure against the trench walls and acts as shoring to prevent collapse. Slurry trench / slurry wall / cutoff wall excavations can be performed in all types of soils, even below the groundwater table. Slurry trench /slurry wall / cutoff wall excavations are normally performed with hydraulic excavators and their widths can vary from 1.5 to 5.0 feet. Excavation depths greater than 100 feet require the use of a crane and clam bucket or other specialty equipment. In most cases, the excavation will key 2.0 to 3.0 feet into a low permeability stratum such as clay or bedrock to assure minimal leakage under the final wall. In some cases, hanging slurry walls / slurry trenches/ cutoff wa
This answer actually came from our website. For more information on slurry walls or other environmental remediation technologies, please see our website – Remedial Construction Services.