What method is being used to construct the residence halls?
The University procured the services of a design-build team using bridging documents (construction documents that are 30 to 35% complete). The selected design-build team then completes the construction documents to 100% as construction proceeds. This method is used to decrease the amount of time it takes to design and then build a building. The savings occurs because the design is being finished as site and foundation work is under way, compressing the schedule.