What kind of material is used for bid item #21 (Backfill Undercut)?
The refill can be dirt or rock as long as it meets the requirements in the Standard Specifications for Road and Bridge Construction. I previously had mentioned that it should be rock refill, but I noticed that we do not have a required subgrade on this project. Therefore dirt or rock can be used for the refill.