Important Notice: Our web hosting provider recently started charging us for additional visits, which was unexpected. In response, we're seeking donations. Depending on the situation, we may explore different monetization options for our Community and Expert Contributors. It's crucial to provide more returns for their expertise and offer more Expert Validated Answers or AI Validated Answers. Learn more about our hosting issue here.

What kind of base is placed under the curb?

base curb Placed
0
Posted

What kind of base is placed under the curb?

0

We make sure the base under the curb is compacted and level. Sometimes we will put a small layer of sand under the curb to ensure it is level. If the curb should settle a little, the expansion joints should control the cracking.

0

We make sure the base under the curb is compacted and flat. Sometimes we will put a small layer of sand under the curb to ensure it is flat. If the curb should settle a little, the expansion joints should control the cracking.

0

The Incredible Edge borders will require that about 1 ½” depth of sod be removed. We make sure the base under the curb is compacted and level. We will put a thin layer of sand throughout the trench to not only better level the trench, but also to assist in drainage. This layer of sand will then be tamped to assure solid ground. In cases when the curb may settle a little, the expansion/control joints should direct any cracking to the nearest joint so the break is unnoticeable. It is proven by the past 25 years of the curbing industry history that our base preparation techniques are more than adequate to promote a strong, long lasting curb. The trench will be approximately 9 inches wide to allow for adequate machine maneuverability.