What is Transport for London doing?
Transport for London is responsible for delivering a 10 billion improvement plan, to open up east London for the 2012 Games and beyond.In particular, the over ground East London Line with be extended south and north to connect with other transport networks. Take a look at Transport for Londons website to learn more about their work for the Olympics.