What is the Warm Spring Extension Project?
The Warm Springs Extension Project (WSX) is a 5.4-mile BART extension south from the Fremont BART station into the Warm Springs District of Fremont. The project has been split into two construction contracts, the Fremont Central Park Subway Construction Contract (the Subway) and the Line, Track, Station and Systems Contract (the Line or LTSS). The Subway will be constructed from just south of Walnut Avenue through Fremont Central Park. The Line contract, which will be design-build, will include the final design and construction of the Warm Springs Station, the above ground trackway, the tie-in at the Fremont Station and the Fremont Station and the transit systems (traction power, electrification, train control, communications) for the entire extension.