What is the usual turn around time on a web design project?
Turn around is something that varies from project to project. There are many variables that must be factored into each project to best project the completion schedule. Things that must be considered include: use of templates or custom design work, size of site, number of pages, complexity of design, readiness of site content, client interaction, database support, programming, and functionality required. With this said, ISD likes to allow a minimum of 1 week for its smallest projects. Please keep in mind, that larger projects can take upwards of 6 months for the most intense sites. Average turn around is 3-4 weeks on smaller sites.