What is the typical lead time for hermetic brazing?
Lead times depend on several factors, such as material lead times and amount of fixturing and/or tooling required. If the customer supplies the material, the lead time is often 1-2 weeks unless extensive tooling needs to be designed and manufactured. If INTA Technologies supplies the materials, it will likely add three weeks to the lead time. Tooling and fixtures for proper hermetic brazing are often required, the lead time for these items can range from one to several weeks.