What is the time frame needed to complete an installation?
We require a fully executed contract and 50% deposit. Upon receipt of these items, ASI will schedule three installation dates. Our client will be notified of these scheduled dates which consist of: 1. Installation date of the steel gate posts, 2. Fabrication and installation date of the gate leaves, and 3. The system installation date. NOTE: The final system installation generally takes 3-4 days to complete if power and telephone line with dial tone are present. Usually from the receipt of the contract and deposit, we schedule completion of the project within 8 weeks. This varies according to our installation schedule and weather conditions which may affect installation.