What is the strip time for most production paint rework parts?
A. The strip time in most cases is directly related to the paint film build on the parts. Most OEM production painted parts have a dry paint film build of from 1 mil up to 10 mils. MILES proprietary paint strip process can remove paints up to 10 mils of paint in 30 minutes to a maximum of 1 hour for stripping automotive coatings that incorporate e-coat, base coat and clear coat coatings.