What is the Storm Water Management Facility (biofiltration wetland)?
Prior to the construction of the wetland, all of the runoff from the Causeway was flowing untreated into Lost Lagoon, compromising the quality of the water. With the wetland functioning, all water from the North side of the Park is channeled down to the wetland and treated before entering the Lagoon.