What is the status of the violation Lehigh was given by the State Water Board?
According to staff from RWQCB, Lehigh has not completed the abatement requirements stipulated by the Board in its Cleanup and Abatement Order (CAO) 99- 018. Although Lehigh’s predecessor Hanson complied with Remedial and Long Term measures specified in CAO 99-018, a long term creek restoration plan must still be completed. The RWQCB has indicated that a revised plan is expected by Lehigh some time in the summer of 2009.