What is the ride-through capability for the UPSs for the current systems? (2) What about the shelving currently located in the UPS Room in the north corner of the Computer Room?
(1) Section C.11.7.2 (Referenced as C.10.12.2 in Amendment 2) states the following: “Based on panel read-outs, the UPS systems for the current system, which is in transition to the April 2005 upgrade, provide a ride-through for the computer systems of 16 minutes on the 500-KVA UPS and 25 minutes on the 225-KVA UPS”. Battery replacements to the 500-kVA UPS and additional system load are expected to change these ride-through times over the next month (See Answer to Question #290). (2) This is currently shared between Raytheon, SGI and the Government and can be removed if the space is needed.
Related Questions
- What is the ride-through capability for the UPSs for the current systems? (2) What about the shelving currently located in the UPS Room in the north corner of the Computer Room?
- What incentives are offered to businesses currently located or considering moving into downtown?
- What education data systems are currently in place in California?