What is the requirement for Sanitary Sewer System?
Individual lots will be required to construct an underground 3-chamber septic tank (as specified in the Deed Restrictions) to collect domestic waste. The septic vault must have a minimum design capacity of 8 cubic meters and a minimum detention time of 36 hours. Septic Tanks will then discharge to an underground main sewer line that will direct all collected waste to a central sewage treatment plant for the entire development.