What is the relationship of the NAVD elevation to MHW mark or to our street elevation or to something we can relate to?
A14. This mark varies from location to location. You may have your exact measurement on your finished floor elevation for your house which was required for flood insurance. Q15. As to the Bulkhead Line, presently and historically the Town has restructured the dune and has pushed sand and the dune beyond the Bulkhead line and almost to the Building Line. With the new dune restructuring will the Bulkhead Line be: a. at the westerly base of the new dune? b. at the center of the new dune? c. or where in relation to the new dune? A15. The Bulkhead Line is a fixed line as shown on your muncipalities tax map and most of the home surveys that are performed in the township. This fixed line will not change. The toe of the new dune, all placement of sand, and all construction work will be on the oceanside portion of the existing bulkhead line. Q16. Our property is not typical in that it DOES NOT extend to the beach high water level.