What is the relation or connection of SDIP to the CALFED Bay-Delta Program?
The August 28, 2000 CALFED Record of Decision specified that: (1) permanent gate installation, (2) selective channel dredging and, (3) agricultural diversion modifications, be carried out to improve conditions for local agricultural diverters (Pages 50-52, Volume 1). In addition, maximum diversion capability at SWP’s Clifton Court Forebay was to be increased to 8500 cfs and subsequently 10,300 cfs provided that new fish screens were installed at CCF (page 49, Volume 1).