Important Notice: Our web hosting provider recently started charging us for additional visits, which was unexpected. In response, we're seeking donations. Depending on the situation, we may explore different monetization options for our Community and Expert Contributors. It's crucial to provide more returns for their expertise and offer more Expert Validated Answers or AI Validated Answers. Learn more about our hosting issue here.

What is the proposed configuration for segments 5 and 6 of SH 130?

0
Posted

What is the proposed configuration for segments 5 and 6 of SH 130?

0

The proposed configuration for Segments 5 and 6 is as follows: Segment 5 will consist of a four lane divided toll highway with a two toll lanes in each direction and two continuous frontage roads in each direction. It will include a direct connect interchange at the future connection of SH 130/SH 45 SE. This interchange will include the following connections: SH 45 to SH 130 SH 130 to SH 45 SH 130 Segment 5 to SH 130 Segment 4 SH 130 Segment 4 to SH 130 Segment 5 Segment 5 will provide grade-separated crossings at the following locations: New Laws Road, New Lockhart Road (CR 176), SH 21, CR 179, CR 222, FM 1185. It will provide ramps from and onto the non-toll lanes at the following locations: North of New Laws Road, between New Lockhart Road and SH 21, between SH 21 and CR 179, between CR 179 and CR 222, and between CR 222 and FM 1185. Segment 6 will consist of a four lane divided toll highway with two lanes in each direction and two continuous frontage roads in each direction up to C

Related Questions

What is your question?

*Sadly, we had to bring back ads too. Hopefully more targeted.

Experts123