Important Notice: Our web hosting provider recently started charging us for additional visits, which was unexpected. In response, we're seeking donations. Depending on the situation, we may explore different monetization options for our Community and Expert Contributors. It's crucial to provide more returns for their expertise and offer more Expert Validated Answers or AI Validated Answers. Learn more about our hosting issue here.

What is the proper and recommended way to install Kids Karpet®?

0
Posted

What is the proper and recommended way to install Kids Karpet®?

0

• ASTM and CPSC require that you have a fall perimeter of at least 6 feet around the playground equipment, with the exception of swings and slides. Swings should have a fall perimeter of at least two times (2x) the height of the tallest point of the structure. Slides require a fall perimeter equal to the height of the slide plus 4 feet, extending to a minimum of 6 feet, needed in front of all slide exits. • Excavate the area and remove any roots, stones, or vegetation. Install geotextile fabric to the base of the area and fill in with 3″ to 6″ of drain stone, such as pea gravel. This amount of drain stone will be dependent on climate and amount of anticipated precipitation. Apply another layer of the geotextile fabric to the top of the drain stone. • Apply the recommended amount of Kids Karpet on the top of the second layer of geotextile fabric. Be sure to apply 3″ to 5″ of Kids Karpet in addition to your original 12″ depth because the material compacts approximately 33% after only a f

What is your question?

*Sadly, we had to bring back ads too. Hopefully more targeted.

Experts123