What is the projected cost for deepening the river to 45 feet?
The United States Army Corps of Engineers estimates a cost of $246 million, although current estimates claim it would be $377 million. The Corps also believes that if the dredged material were to be used for various public works projects instead of dumping, this would add $190 million to the overall cost.