What is the process involved in paving my driveway or parking lot?
First, we visit your site and offer a written proposal indicating an estimated timeframe. Second, if there is an existing driveway, it is removed to inspect the conditions of the base. Following, gravel is placed to provide adequate grade, which is then compacted using rollers. The compacted stone or gravel is left for approximately 4 weeks, after which we return to place the asphalt. The asphalt is spread using an industrial spreader, thus ensuring proper thickness, and is compacted using static rollers to provide a high quality finish. In case of parking lots that require striping, the striping of parking lines is done after the asphalt has set. We recommend letting the asphalt and striping cool and set for at least 3 days before parking your vehicles.