What is the process for issuing domestic nonavailability waivers?
Once a waiver request is submitted, the EERE Buy American team initiates a formal consultation process with the National Institute of Standards and Technology’s Manufacturing Extension Partnership (MEP). MEP has 59 affiliated centers nationwide with substantial knowledge of American domestic manufacturing capabilities. MEP uses its network of centers to “scout” for manufacturers and potential manufacturers of the product identified in the waiver request. EERE also contacts manufacturing trade associations and conducts independent research to determine whether a product is manufactured in the United States. EERE aims to complete this scouting process and issue a waiver determination approximately 4 weeks after receiving a waiver request.
Related Questions
- How long does an Exception, Variance, and Conventional Rezoning process take? What about Administrative Deviations and Waivers?
- How long does it take to process the Domestic Wastewater Collection / Transmission System Construction (Sewer Extension) Permit?
- Are there guidelines for issuing HAZWOPER citations when I am conducting a Process Safety Management (PSM) investigation?