What is the procedure to install casement & awning vinyl windows?
PROTECT YOUR GUARANTEE READ AND FOLLOW THE INSTRUCTIONS BELOW IMPORTANT • Before installation, be sure window is closed and locked. • For new construction, caulk area where either the nailing flange or window jamb meets the exterior finish material. • For proper operation and performance, it is important that there be clearance of approximately 3/8″ on sides and 1/2″ on top between the window and the rough stud opening. • Window must be installed- (A) Plumb (B) Level (C) Square (D) Shimmed • Insure that window is shimmed under casement and awning hardware. • Secure window in opening by fastening nailing flange and by using 2 1/2″ wood screws through side jamb into stud at shimmed locations. • Install insulation between jamb and framing. Use only enough insulation to loosely fill the opening. Packing too much insulation may distort the frame member. • For smooth performance of the operating sash, the keepers will need necessary adjustments. Also apply silicone spray to operating hardwar