What is the procedure for applying the Titan Process?
Titan has a five-step process as we review a field’s suitability and likelihood of success: • Field screening based on historical and physical field characteristics. • Fluid sampling of a representative well from the target field and detailed laboratory analysis (this step takes from 5-7 weeks). • Treating a single producing well with an In-Situ Microbial Response Analysis (ISMRA™). This step is critical to the analysis and forward treatment program. • Conducting a pilot program in one or more water injection wells to monitor the response on adjacent producing wells. Fluids from the production wells are then tested in Titan’s laboratory to document the microbial behavior. • Expansion to a larger pilot or full field application depending on field size. Treatments are on a cyclical basis. The frequency is initially 8-12 weeks but is dependent on the characteristics of the field and the response in the producing wells affected by the water injection wells. Once the microbial ecology is es