What is the potential scope of the West Section, LBJ Freeway Project, for design and construction as a Comprehensive Development Agreement (CDA)?
6. (Answer) The West Section for IH 635 (LBJ Freeway), from a planning perspective, includes the entire project from Luna Road to the US 75/IH 635 (Dallas High Five) interchange project. This includes the complete limits of the IH 35E/IH 635 interchange reconstruction from Royal Lane to Valwood Parkway. The focus of a CDA will be to design, construct and begin the operation of the LBJ Freeway Managed Lanes. To do this a major portion of the West Section improvements will need to be designed and constructed. The project generally can be broken into three parts. [07/01/03] • West Section Dallas High Five interchange to Webb Chapel: Build the managed lanes and the necessary general purpose lanes, ramps, frontage road, cross street and connecting components to open the managed lanes. • Part 1 DHF to Preston: Complete Construction • Part 2 Preston to Midway (Tunnel): Complete Construction • Part 3 Preston to Midway (Surface): Phased Construction • Part 4 Midway to Webb Chapel: Phased Constr
Related Questions
- What is the potential scope of the West Section, LBJ Freeway Project, for design and construction as a Comprehensive Development Agreement (CDA)?
- Will TxDOT use an Owner Controlled Insurance Program (OCIP) for the West Section, LBJ Freeway Project?
- When does CDM 2007 (Construction, Design and Management Regulations 2007) apply to a project?