What is the plan for the riverbank work?
The riverbank plan will provide ecological restoration and selective stabilization. Restoration will be performed from Western Boulevard to Tyler Avenue by removing loose debris and invasive species and replanting with native trees and shrubs. Stabilization will be provided from Madison to Adams and in the area along Jackson Plaza.