What is the plan for the renovation?
• Our first priority is to repair the structural issues in our sanctuary. Work will immediately begin in shoring up the walls, ceiling and roof of the sanctuary. In addition we are investigating the cause of the water problems in the basement and will be repairing them right away. These two projects are of the utmost priority. • The design will be broken down into two large phases – One being the sanctuary, the other being the hall. The committee has currently charged the architect to provide the design documentation for the renovation of each of these structures incorporating as many of the original designs from the previous plans. The current agreement with the architect allows the committee to incorporate as many of his suggested designs or to reduce the scope of his recommendations based on our preferences and cost restrictions.
Related Questions
- I do not plan to do any renovation work in pre-1978 housing. Must I be a certified renovator to distribute the Renovate Right brochure or the "opt-out acknowledgement" form to potential clients ?
- The 2000 renovation plan called for a "connector wing" to extend from Crossroads to the 1925 San Jacinto building. Will this same connector be in place in the new renovation proposal?
- Which choice renovation or new construction fits in with Keene s Community Goals, Master Plan and Zoning Ordinance?