What is the Paragon II Hub-Pac Power up Sequence?
• All devices and targets must be powered off • Connect CIMs to targets • Connect CIMs to Hub-Pac • Configure Hub-Pac to PII UMT (make topology connections with all devices off) • Power up Targets • Power up Hub-Pac (Power on one PII Hub-Pac at a time). • Execute the 1st to 3rd tier power sequence with a partial reset on base after the system database has been loaded. If multiple base units are involved, execute partial reset on each base after the data base is loaded. The database is not completed loading if the LCD of the base UMT flashes “DB Sorting…” message.