What is the onsite building of the red iron frames like?
Not too bad. A simple 2000 SF house should have the frames assembled and erected in a day (day and 1/2 to 2 days with an inexperienced crew). Experienced crews can easily have it up and all the roof purlins on, ready for roof sheathing, in two days. Complicated and/or large designs require more skill and time.