What is the NRCs plan regarding the timing of the inspections?
Revision 1 of IP-71003 states that the inspection program will be implemented before the PEO, and the inspection plan will indicate the duration. By contrast, the draft of Revision 1 indicated that the licensee could notify the NRC when it was ready for inspection; however, that wording has since been eliminated.