Important Notice: Our web hosting provider recently started charging us for additional visits, which was unexpected. In response, we're seeking donations. Depending on the situation, we may explore different monetization options for our Community and Expert Contributors. It's crucial to provide more returns for their expertise and offer more Expert Validated Answers or AI Validated Answers. Learn more about our hosting issue here.

What is the minimum level for the discharge flow to Pedhieos River?

Discharge flow level minimum
0
Posted

What is the minimum level for the discharge flow to Pedhieos River?

0

Topographical elevations of the site are provided in Vol. V, Annex 11. The maximum elevation of the river to be accounted for in the tender is 98.00 m above sea level. Question 111: Should we leave space inside the buildings for the extension of Phase 2? Should even the necessary concrete foundations be constructed within the buildings for future extension? For the scope of work for stage 1, please refer to Volume III, Section A, Chapter 6 – Description of the Scope of Works. Question 112: Volume I, Section 5 Definition of ‘Foreign currency’: Any currency permissible under the applicable provisions and regulations other than the Euro, which has been indicated in the tender. Apart from the Euro, are other foreign currencies as USD and/or Yen permitted? Please confirm. No. Only EUR is allowed. Question 113: We don’t understand Volume 1 Section 1 4.2.3 Technical Capacity Tenderer HASPOLAT WWTP “a) Experience in construction, process design, monitoring of installation of process equipment

Related Questions

What is your question?

*Sadly, we had to bring back ads too. Hopefully more targeted.

Experts123