What is the maximum distance between the Meredosia facility and the storage site?
The FGA is not setting a limit on pipeline length. For those sites that can meet all Qualifying Criteria, a host site for the CO2 storage hub will be selected based on what provides the best overall value to the project. For example, a site requiring a longer pipeline, with well-characterized geology and the ability to obtain all necessary property rights, may provide better overall value than a site requiring a shorter pipeline that does not have well-characterized geology.