Important Notice: Our web hosting provider recently started charging us for additional visits, which was unexpected. In response, we're seeking donations. Depending on the situation, we may explore different monetization options for our Community and Expert Contributors. It's crucial to provide more returns for their expertise and offer more Expert Validated Answers or AI Validated Answers. Learn more about our hosting issue here.

What is the installation time for a horizontal well?

0
Posted

What is the installation time for a horizontal well?

0

Installation time can vary based on the length and depth of the well and the complexity of the geology. For example, Longbore completed a 437.1 metre (1434 ‘) continuous well (HDPE screen and casing) completed in gravel and cobble formation. The installation required eight days, with an additional two days of well development. Wells of 61 metres (200’) or less have been completed in less than three days. Blind wells normally require slightly more time for installation. Longbore completed a blind well, total length of 335.3 metres (1100’) with 208.8 metres (685’) of screen, in fifteen days including rig up/down and well development.

Related Questions

What is your question?

*Sadly, we had to bring back ads too. Hopefully more targeted.

Experts123