What is the installation process for my new oil & stone driveway?
~ The same preparation work is required when installing either an asphalt or an oil & stone surface. Once the driveway base is prepared, a sprayer applies hot RC-250 over the driveway base. A layer of stone or gravel is then applied by spreader truck over the treated driveway surface. The gravel is then rolled and compacted. If two coats of oil and stone are being installed, the surface is treated again with oil (RC-250), another layer of gravel is added and again compacted by a roller.