What is the goal of the Fields of Green Project?
A. Mansfield Youth Soccer has embarked on a fund raising project for field renovation at the Plymouth Street facility. The field area that is commonly known as field 1 or front fields has a severe water damage and drainage issue. As a result of very poor drainage (improper drainage and soil composition) the fields are often unplayable or, as occurred in Fall 2006 taken off line for extended periods of time. In fall 2006 and spring 2007, MYS was forced to cancel over 100 practices and over 90 games because the fields were not fit to play on. This renovation project consists of raising funds as well as driving the effort to implement the field renovation solution.