Important Notice: Our web hosting provider recently started charging us for additional visits, which was unexpected. In response, we're seeking donations. Depending on the situation, we may explore different monetization options for our Community and Expert Contributors. It's crucial to provide more returns for their expertise and offer more Expert Validated Answers or AI Validated Answers. Learn more about our hosting issue here.

What is the field fix if hold-down or shear bolts are too high or too low?

0
Posted

What is the field fix if hold-down or shear bolts are too high or too low?

0

If the bolts are too high, they can be cut down to the appropriate height or washers can be stacked below the nut. If the bolts are too low, it is possible to gain 1-1/2″ by removing the wood bottom plate and installing the product directly on the slab or curb. When eliminating the 1-1/2″ bottom plate, install a 1-1/2″ filler on top of the Panel or Frame and make the top connection with 1/4 x 4-1/2″ screws.

Related Questions

What is your question?

*Sadly, we had to bring back ads too. Hopefully more targeted.

Experts123