What is the estimated payback period specific to Onsted?
If we assume that the approximate savings discussed above of $30,000 is accurate, and we also assume that the cost of installing the Geo-exchange system is approximately $200,000 more than the cost of the conventional system it will replace, the payback on the investment in the Geo-exchange system is between 6-7 years.