What is the difference between the Replace and Change DELFOR?
The Replace DELFOR means a complete regeneration of the previous document. You must set your system to completely delete the previous DELFOR data and load the new DELFOR data in your business application. Cummins does not send zero quantities in the DELFOR. If you do not fully replace the DELFOR, old requirements could get left behind in your planning system. The Change DELFOR is a change in the schedule for a specific part number. Your system must update the schedule for that part number with the new schedule.
Related Questions
- Can I replace a traditional water softener system with a SP water conditioner and what difference in performance should I see between the two systems?
- What is the difference between an asphalt overlay and a saw cut remove and replace?
- What is the difference between "Brick Block" and "Replace" buttons ?