What is the difference between cost depletion and percentage depletion?
Cost depletion allows a recovery each year of a portion of the capitalized costs, including the cost of the oil and gas lease, of a producing well over its life. The portion of those costs that can be recovered each year is based on the percentage of the estimated recoverable oil and gas reserves sold during each year.