What is the current status of the project related to the design and construction schedules?
With the ROD in hand, the North Texas Tollway Authority (NTTA) has advertised for engineering consultants to complete the project’s final design. Because of the large size of the project, NTTA will hire several firms to prepare the detailed design of the elements of the projects including the bridges, interchanges and retaining walls. The consultants hired to do the project design will use the Corridor Master Plan (CMP) as their guide to incorporate the desired and agreed upon parkway elements.