What is the current anticipated or approximate diameter for the proposed pipeline that will bring captured CO2 to the hub facility?
The diameter of the buried pipeline will be determined during design studies conducted over the coming nine months. The size will be driven by the need to transport CO2 from the Meredosia plant and any expansion capacity that is built into the system. Very preliminary estimates suggest a range of between about 12″ to 24″ pipeline.