WHAT IS THE COST OF A FULLY OPERATIONAL FACILITY?
The actual cost of each plant will vary depending on site location, available infrastructure for the site, whether an existing building is available and whether or not it will include a shredding operation. Titan estimates that the turn-key contract cost for the initial U.S. operation, exclusive of site, building, infrastructure and shredder costs will be approximately $20 Million, which does include the activated carbon circuit, license fee and the costs of Titan s technical supervision and assistance.